ICP E2E Test Projects — All 4 Complete (2026-04-06)

## Summary
Completed 4 ICP-aligned E2E test projects exercising the full CMS-aiChemist pipeline:

### Projects Delivered
1. **TestimonialWall** (Digital Agency ICP) — 12 tokens, responsive social proof grid with star ratings
2. **MetricsPanel** (SaaS Product Team ICP) — 12 tokens, KPI dashboard widget with trend arrows and status colors
3. **AuthorBioCard** (Content Publisher ICP) — 13 tokens, editorial author profiles with social links and article counts
4. **FeatureComparisonTable** (Enterprise Design System ICP) — 13 tokens, WCAG-accessible comparison table with ARIA attributes

### Pipeline Path Exercised Per Project
ADW spec → DTCG tokens → shared UI component → Next.js route → design system catalog → stats sync → build verification

### Final Platform Stats
- **171 DTCG tokens** (grew: 121 → 133 → 145 → 158 → 171)
- **9 shared components** (Button, Card, Tabs, Alert, PricingTable, TestimonialWall, MetricsPanel, AuthorBioCard, FeatureComparisonTable)
- **10 Next.js routes** (/, /dashboard, /design-system, /kaleido-life, /pricing, /testimonials, /metrics, /authors, /compare)
- All routes build and render successfully (Next.js 15.5.14, 0 errors)

### Commits (16 total, 4 per project)
Tokens → Component → Route → Integration, with build verification at each stage.

### Validation
- Token pipeline: 171 tokens verified via build.py
- Component count: 9 .tsx files in packages/ui/src/components/
- Barrel exports: 9 export lines in index.ts
- Nav links: 9 links in layout.tsx
- Build: All 10 routes generate as static pages with 0 errors
- Stats synced: landing page, dashboard, design system catalog
