# Session Handoff — Entry Points + Click Paths (2026-04-07)

## Session Outcomes

### 1. Click Path Audit (COMPLETE)
- 79 routes verified, ALL returning 200
- Cross-site navigation wired between cms.chem.dev ↔ cms-content.chem.dev
- Dashboard "View Details" buttons now navigate to /dashboard/[id] detail pages
- cms-content CTAs (Get Started, View Documentation, Launch Platform) wired to cms.chem.dev
- Stale stats updated across all pages: tokens 328→983, components 18→66

### 2. Entry Points Restructure (COMPLETE)
Replaced 69-link flat nav with persona-aware grouped navigation:

**Primary Nav (8 items + dropdown):**
Platform | Dashboard | Design System | Components | Showcase ▾ | Get Started | Docs | Status | Blog

**Showcase Dropdown (11 items):**
Kaleido-Life, Life Score, Investor Relations, Wellness, Pricing, Testimonials, Metrics, Authors, Compare, Timeline, Wizard

**New Hub Pages:**
- `/getting-started` — 4-step onboarding wizard (Tokens → Pipeline → Components → Deploy)
- `/components` — Categorized component index (66 components, 8 categories, search/filter)
- `/docs` — Documentation hub (Architecture, Design System, Operations, External Resources)

**Persona Entry Points:**
| Persona | Entry | Path |
|---------|-------|------|
| External evaluator | / | Landing → Pricing/Compare/Testimonials |
| Internal developer | /dashboard | Dashboard → Design System → Components |
| Designer | /design-system | Tokens, Components, Showcase |
| Content editor | cms-content.chem.dev | Home → Blog → CMS Admin |
| Agent (Claude Code) | /status | Status → Ref docs → Tokens |
| New project | /getting-started | Guided 4-step wizard |
| Existing project | /dashboard/[id] | Project detail → tokens, components |

### 3. Blog Fix (COMPLETE)
- Root cause: Missing `src/live.config.ts` for EmDash Astro 6 live collections
- Fix: Created `defineLiveCollection({ loader: emdashLoader() })` config
- Blog now loads "Platform Launch" post at cms-content.chem.dev/blog

## Commits This Session
| Commit | Description |
|--------|-------------|
| `4100087` | Cross-site nav, click paths, dashboard detail, stale stats |
| `72a0a9a` | Persona nav (19 links), 3 hub pages, entry points restructure |
| `b21ab52` | Drift reports + static sync |

## Platform State
- 66 components, 983 tokens, 562 tests (3 files), drift 100/100
- 79 routes verified (75 Next.js + 3 Astro + 1 static ref)
- Nav: 19 links (8 primary + 11 dropdown)
- EmDash 0.1.0, blog operational
- gcloud OAuth expired — needs `gcloud auth login`

## Brain Sources Updated This Session
- Source 25: WellnessMatrix pipeline status (STATUS_COMPLETE)
- Source 26: Lighthouse benchmarks + a11y fixes (STATUS_COMPLETE)
- PENDING: Entry Points Plan Baseline (saved locally, push blocked by OAuth)
- PENDING: This session handoff (push blocked by OAuth)

## Next Priorities
1. gcloud auth refresh → push pending brain sources
2. FTP DNS record → deploy static mirror
3. GitReport automation hooks
4. Deeper interaction test coverage
