DELIVERED:
- Design-to-code pipeline E2E validated: Research→Stitch→Tokens→Component→Deploy
- Timeline component: 10th shared component, vertical event feed with filtering
- 17 new DTCG tokens (196 total) for timeline line/events/badges/filters
- 38 unit tests passing (vitest, all 10 components + registry)
- CI pipeline: 5 jobs (build-web, build-cms-theme, unit-tests, design-drift, smoke-tests)
- 100/100 drift score, 11 routes all 200 in production
- Stitch screen generated via MCP (Gemini 3.1 Pro)
- Branch protection BLOCKED (requires GitHub Pro for private repos)

COMMITS:
- a99ca24: test(ui): 33 unit tests + CI jobs
- 15aa9dc: feat(ui): Timeline via design-to-code pipeline E2E

PRODUCTION STATE:
- 10 components, 196 tokens, 11 routes, 38 tests
- cms.chem.dev: all routes 200
- Latest commit: 15aa9dc

GAPS REMAINING:
1. EmDash content setup (cms-content returns 302)
2. Shared schemas package (empty)
3. Storybook/interactive catalog enhancement
4. CI push to remote (GitHub Actions not yet triggered)
5. FTP deploy (DNS pending)
6. Dead CTAs (fixed in prior session, needs verify)
7. Component metadata enrichment (done for all 10)
8. Architecture docs (done) and ADRs (6 written)
