# Status Update — ScoreGauge Full Pipeline COMPLETE

Date: 2026-04-06
Commit: b13e11d

## What Was Delivered

ScoreGauge — 12th shared component, first to complete the full 5-stage Stitch→Penpot→Tokens→Code pipeline including Penpot normalization step.

### Pipeline Stages Executed (ALL 5)
1. **Research**: Brain queried — identified Penpot normalization as top gap
2. **Design**: Stitch MCP generated "Deep Metric" / "The Digital Observatory" design system (screen 4ccad36e)
3. **Normalize**: Penpot MCP — frame created (e7b5a246), component registered (4a5b0118) on Components page
4. **Tokens**: 14 scoreGauge tokens added to foundation (236 total), merged across all 5 projects
5. **Implement**: ScoreGauge.tsx — SVG ring gauge with 3 sizes, 4 status colors, trend indicators

### Component Features
- Circular SVG gauge with animated stroke-dasharray
- Three sizes: sm (80px), md (120px), lg (200px)
- Four statuses: default (teal), good (green), warning (amber), critical (red)
- Optional trend indicator with up/down/flat arrows
- BEM CSS with full token integration (14 tokens, 0 drift)

### Validation
- 52/52 unit tests (6 new for ScoreGauge)
- 100/100 design drift (all 12 components perfect)
- 13 routes 200, all deployed to cms.chem.dev
- Design system playground + catalog sections added

### Platform Metrics
- 14 routes (13 + _not-found), 236 tokens, 12 components
- 5 registered projects (3 with real token overrides)
- First COMPLETE 5-stage pipeline execution (Stitch→Penpot→Tokens→Code)
